The water purification system has been successfully operating at the Gazprom facility for 6 years

For about 6 years, the water purification system, which is based on the electrocoagulation unit and produced by «H2O water treatment system» LLC has been operating at the facility of a large oil and gas company Gazprom. The installation is made in Arctic design and works in harsh Russian winters.
The main task within the framework of this installation is the purification of such contaminants as permaganate oxidability, increased iron content, turbidity of water. Despite the fact that after a year the quality of the original has decreased, the system successfully fulfills its task.